In order for the summer camp facilities to transform to a proper hospitality center that accommodates vulnerable refugees , it requires a series of electrical works that are summarized as follows:
A) Laundry facilities
- 6 fluorescent lighting and t
- 2 external sockets along the corridor
- 4 fluorescent fixtures
- 2 external sockets for the carwash.
- For the laundry feeding to be installed from the beginning it needs a series of external panels with fuses, switches and external sockets (4 total) for the safe operation of the laundry
- handling of lights from the entrance.
B) In the courtyard that there is under the shelter, there will be placed six watertight fluorescent tubes with 4 exterior switches and the old worn out fixtures will be uninstalled
C) In the area of the bathrooms, three watertight fluorescent vessels will be installed outside the entrances and the bathrooms lamps bathrooms will be replaced with new type led a total of 12 and will get additional 4 double fluorescent bodies. In the bathrooms and the WC a total of 12 lamp holder and transfer the handling of the lighting at the entrance to five external waterproof switches.
C) In the area of the bathrooms, three watertight fluorescent vessels will be installed outside the entrances and the bathrooms lamps bathrooms will be replaced with new type led a total of 12 and will get additional 4 double fluorescent bodies. In the bathrooms and the WC a total of 12 lamp holder and transfer the handling of the lighting at the entrance to five external waterproof switches.
D) In the multipurpose area, two fluorescent lights will be bought to replace the old light switches
E) In the courtyard, seven led headlights will be placed in the areas close to the forest, the church and the damaged ones will be safely removed.
F) For the tents and the prokat wooden houses, there will be a reinforced metal outer board three rows and switches and fuses for the power supply will be placed for every tent with a separate cable switch for safety reasons. While there will be a hook (hasp) for air anchoring cables for all the tents. Each tent will have a fluorescent body, switch and two reinforced sockets. To illuminate the pool the tents a led projector While there will hook (hasp) for air anchoring cables to the scenes. Each scene will have a fluorescent body, switch and two reinforced sockets. To illuminate the pool scenes will be placed led projector with an external switch.
G) In all wooden houses, the old switches and sockets will be replaced in order to ensure the safe functioning and installment of the lighting
Specifications
The tubs are tight fluorescent lamps with dual color white protective cap. The headlights are type led to energy savings with two years warranty and durability of 25,000 hours. Two boards (laundry and multipurpose) will be modified and strengthened with new fuses installed while an external metal board will also be installed.
The above have been estimated and agreed as follows:
Labor: 1,500 euros
VAT Labor: 240 euros
Material cost with VAT : 1,440 euros
Material cost with VAT : 1,440 euros
Total cost: 3,180 euros